LVWATSAN PROJECT LAUNCH | 12/5/2017

Submitted by on 4 June 2016


Lake Victoria Basin covers an area of 250,000 km2 with the lake taking 68,000 km2. The basin has a population of 35 – 40 million people, with rapidly growing secondary towns, which has resulted in: Unplanned, spontaneous and unsustainable growth Run-down and non-existent basic infrastructure and services Lake Victoria Basin covers an area of 250,000 km2 with the lake taking 68,000 km2. The basin has a population of 35 – 40 million people, with rapidly growing secondary towns, which has resulted in: Unplanned, sponteneous and unsustainable growth Run-down and non-existent basic infrastructure and services Significant negative impacts on environment, and importantly, the fragile ecosystem of the lake The lake is major-transboundary resource for EAC countries with a high potential to accelerate the growth of the towns around it if well managed and the potential sustainably harnessed In recognition of the challenges presented by rapid urbanization in the basin, the EAC formulated a framework to reverse the deteriorating conditions, through a ‘Protocol on Sustainable Development of the Lake Victoria Basin‘. By improving coverage as an indicator and increasing both water supply and sanitation coverage, the EAC would be achieving its objective in the water and sanitation sector as a key area of cooperation. The scope of works in Phase II LVWATSAN Project Formulation include: Detailed immediate-to-medium term designs for the 15 secondary towns, inclusive of topographic surveys Projections for long term interventions Capacity building plans National policies, goals and institutional structure review Validated Investment Plans Preliminary design of long term programs Estimated costs, financing and implementation schedule (Grant and loan financing to be separated in cost estimates assignment) Social and environmental management plans and implementation manuals M&E system to be designed for project progress and reporting system And the studies to be undertaken include: Development of alternative solutions and selection of the best intervention, based on multi-criteria analysis and preparation of statements of works and cost estimates Sanitation options considering ECOSAN Principles, wastewater collection, treatment and disposal Safe disposal of feacal matter and solid waste Storm water drainage Technical, financial and institutional capacity build-up Strategies aimed at influencing policy and physical planning Balance supply augmentation with demand management Environmental Impact Assessment Risk exposures and mitigation measures The principal beneficiaries of the project will include Un-served and under-served residents in the secondary urban centres, especially the poor, women and children Water user groups as a consequence of being supported to get organized as part of the initiative Local institutions and organizations responsible for service provision, which will benefit from enhanced capacity and more efficient operations Other beneficiaries will be NGOs, CBOs and the newly formed utilities under the sector reforms process Local agencies responsible for environmental monitoring Local government bodies in areas of development planning and regulatory functions Project Description Between 2004 and 2007, in consultation with national and local authorities and local stakeholders, an initial assessment was undertaken to identify WATSAN investments and related capacity building needs in 30 preselected secondary towns, through questionnaires, interviews and meetings. The assessment concluded that the towns needed urgent strategic WATSAN Initiatives

Share this content


PROGRAMS & PROJECTS

11TH JOINT REGIONAL POLICY STEERING COMMITTEE MEETING OF LAKE VICTORIA BASIN COMMISSION TO BE HELD IN KISUMU

The 11th Joint Regional Policy Steering Committee (JRPSC) meeting of the Lake Victoria Basin Commission’s projects and programs will be held in Kisumu from January 29th to 31st, 2025. The meeting will bring together ministries responsible for Water, Environment and ...
Read More

LVB IWRMP

Lake Victoria Basin Integrated Water Resources Management Programme (LVB IWRMP) Lake Victoria Integrated Water Resources Management Programme (LVB IWRMP) is a regional programme coordinated by Lake Victoria Basin Commission (LVBC) and implemented in the four Partner States of the East ...
Read More

ACC-LVB

Adapting to Climate Change in Lake Victoria Basin Project (ACC-LVB)
Read More

ScaleWays Project

Scaling out resilient Water and Agricultural Systems (ScaleWAYS) is a project implemented under the broader framework of Advancing Water Futures and Scenarios (WFaS East Africa: Accelerating transition towards resilient water and Food Systems). It’s a research project that would be ...
Read More

EPSGG-LVB

Project on engaging private sector for green growth in Lake Victoria Basin (EPSGG-LVB)
Read More

PREPARED

The Planning for Resilience in East Africa through Policy, Adaptation, Research and Economic Development (PREPARED) is a medium-term, multi-organization program partially implemented in the East African Community.
Read More




EVENTS




NEWS

EAC PARTNER STATES COMMIT TO BOOSTING INVESTMENT IN LAKE VICTORIA CONSERVATION.

The East African Community (EAC) Partner States have committed to boosting investments in the conservation of Lake Victoria, the world’s second-largest freshwater lake, which has long been threatened by pollution and the adverse effects of climate change. During the 11th ...
Read More

11TH JOINT REGIONAL POLICY STEERING COMMITTEE MEETING OF LAKE VICTORIA BASIN COMMISSION TO BE HELD IN KISUMU

The 11th Joint Regional Policy Steering Committee (JRPSC) meeting of the Lake Victoria Basin Commission’s projects and programs will be held in Kisumu from January 29th to 31st, 2025. The meeting will bring together ministries responsible for Water, Environment and ...
Read More

COUNCIL OF MINISTERS APPROVES ADDITIONAL FUNDING FOR THE CONSTRUCTION OF THE NEW LVBC HEADQUARTERS

The East African Community Council of Ministers meeting has approved an additional funding of USD 802,126 for the completion of the new Lake Victoria Basin Commission headquarters in Kisumu. East African Community Secretary General H.E. Hon. Veronica Mueni Nduva announced ...
Read More

LVBC TEAM PARTICIPATES IN COP 29 IN BAKU, AZERBAIJAN

Deputy Executive Secretary Eng. Coletha Ruhamya is leading a delegation from the Lake Victoria Basin Commission at the 29th Conference of the Parties of the UNFCCC (COP 29) in Baku, Azerbaijan. The LVBC team is set to host a side ...
Read More

FINANCE AND ADMINISTRATION COMMITTEE APPLAUDS PROGRESS ON NEW LVBC HEADQUARTERS CONSTRUCTION

The East African Community members of the Finance and Administration Committee have praised the Lake Victoria Basin Commission for the progress made on the construction of its new headquarters. Led by Honorable Andrea Aguer Ariik Malueth, the EAC Deputy Secretary ...
Read More

LVBC HEADQUARTERS CONSTRUCTION HITS 72% MILESTONE.

The construction of the state-of-the-art Lake Victoria Basin Commission Headquarters is nearing completion. Currently, the overall progress of the building stands at 72%, with external works at 68%. Electrical and mechanical installations are at 62% and 68%, respectively. Office Block ...
Read More